HIGHLY COMMENDED
After
Close up
GREEN MEWS
HOVE BN3 5QT
A tight urban site with three new two-bed dwellings. The planning process proved challenging but was granted in 2017. The client’s main desire was then to bring the units through to completion being carbon neutral. This was achieved by close co-operation between DLS:ARCH & CLT Structures together with considerable client input.
Submitted by: DLS:ARCH Ltd, Chichester www.dlsarch.co.uk
Architect: DLS:ARCH Ltd (Post Planning) | Liam Russell Architects (Up To Planning), Brighton www.liamrussellarchitects.co.uk
Site Manager: Ed Holtby, Olive Modular Ltd, Chichester www.olivemodular.com
Contractors: CLT Structures LLP, Brighton | Olive Modular Ltd
Other: Thorpe Engineering Consultants (Structural-Civil Engineer), Bournemouth www.thorpe.uk.com | Mantis Energy Ltd (M&E Consultant), Wimslow www.mantisenergy.co.uk | Olive Modular Ltd (Principal Designer) | Brickbond Limited (Demolition & Groundworks), Brighton. www.brickbond.org.uk | Vantage Roofing Ltd, Bexhill www.vroofing.co.uk